0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Meredosia as the point of interconnection, all in IL.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2703 Not reported 345 398 Solar Withdrawn
J3360 Not reported n/r 250 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.