Substation Scout

MEC Drager - Grand Junction substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name MEC Drager - Grand Junction as the point of interconnection, all in Greene County, IA.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J093 Not reported 161 50 Wind Withdrawn
J118 Not reported 161 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first