McCredie - Montgomery Line Tap substation interconnection queue

2 active projects totaling 1,500 MW in the MISO queue.

2 MISO queue filings name McCredie - Montgomery Line Tap as the point of interconnection, all in Randolph County, MO.

2active projects
1,500active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1490 Not reported 345 1,000 Other Active
J1488 Not reported 345 500 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.