Marquette - Vergennes Line Tap substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Marquette - Vergennes Line Tap as the point of interconnection, all in Ionia County, MI.

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1064 Not reported 138 200 Wind Withdrawn
J1255 Not reported 138 200 Solar Active
J1327 Not reported 138 20 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.