Marked Tree substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Marked Tree as the point of interconnection, all in Poinsett County, AR.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2386 Not reported 161 300 Solar Withdrawn
J2521 Not reported 161 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.