Manuel Substation substation interconnection queue
1 active project
totaling 150 MW in the MISO queue, plus 1 with terminal status (shown grayed).
2 MISO queue filings name Manuel Substation as the point of interconnection, all in Evangeline Parish, LA.
1 active projects
150 active MW
2 total filed
Queue ID Project kV MW Resource Status
J1286
Not reported
138
150
Solar
Active
J1290
Not reported
138
25
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.