1 active project totaling 150 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Manuel Substation as the point of interconnection, all in Evangeline Parish, LA.

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1286 Not reported 138 150 Solar Active
J1290 Not reported 138 25 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.