0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Mandan as the point of interconnection, all in Morton County, ND.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J1893
Not reported
230
500
Wind
Withdrawn
J2101
Not reported
230
100
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.