MAJESTIC - MILAN substation interconnection queue

1 active project totaling 245 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name MAJESTIC - MILAN as the point of interconnection, all in Washtenaw County, MI.

1active projects
245active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3945 Not reported 345 245 Solar Active
J3333 Not reported 345 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.