1 active project totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Majestic - Lemoyne Line Tap as the point of interconnection, all in Washtenaw County, MI.

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1062 Not reported 345 200 Solar Active
J1046 Not reported 345 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.