Lyon County Substation substation interconnection queue

2 active projects totaling 278.5 MW in the MISO queue, plus 2 with terminal status (shown grayed).

4 MISO queue filings name Lyon County Substation as the point of interconnection, all in MN.

2active projects
278.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2599 Not reported 345 216 Solar Active
H083 Not reported 345 200 Wind Withdrawn
J739 Not reported 345 200 Wind Withdrawn
J400 Not reported 115 62.5 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.