Lula - Tunica Line substation interconnection queue

1 active project totaling 160 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Lula - Tunica Line as the point of interconnection, all in Tunica County, MS.

1active projects
160active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1440 Not reported 115 160 Solar Active
J1439 Not reported 115 40 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.