Ludington to Keystone substation interconnection queue

1 active project totaling 223 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Ludington to Keystone as the point of interconnection, all in MI.

1active projects
223active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2670 Not reported 345 223 Solar Active
J1543 Not reported 345 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.