Substation Scout

Linton NW substation interconnection queue

2 active projects totaling 85 MW in the MISO queue.

2 MISO queue filings name Linton NW as the point of interconnection, all in Emmons County, ND.

2active projects
85active MW
2total filed
Queue IDProjectkVMWResourceStatus
J4077 Not reported n/r 45 Solar Active
J4070 Not reported n/r 40 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first