Substation Scout

Line tap on Superior-Wayne line at 42., -83. substation interconnection queue

2 active projects totaling 230 MW in the MISO queue.

2 MISO queue filings name Line tap on Superior-Wayne line at 42., -83. as the point of interconnection, all in Washtenaw County, MI.

2active projects
230active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3654 Not reported 120 150 Battery Active
J3653 Not reported 120 80 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.