Lime Creek Substation substation interconnection queue

2 active projects totaling 350 MW in the MISO queue, plus 2 with terminal status (shown grayed).

4 MISO queue filings name Lime Creek Substation as the point of interconnection, all in IA.

2active projects
350active MW
4total filed
Queue IDProjectkVMWResourceStatus
G735 Not reported n/r 200 Wind Operational
G595 Not reported 161 150 Wind Operational
J1176 Not reported 161 145 Wind Withdrawn
J049 Not reported n/r 16 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.