Lemoyne-Majestic substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Lemoyne-Majestic as the point of interconnection, all in Monroe County, MI.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1969 Not reported 345 150 Solar Withdrawn
J1951 Not reported 345 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.