Leesburg substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Leesburg as the point of interconnection, all in Kosciusko County, IN.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2443 Not reported 345 500 Battery Withdrawn
J2512 Not reported 345 173 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.