Substation Scout

Ledyard-Colby substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Ledyard-Colby as the point of interconnection, all in Worth County, IA.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2462 Not reported 345 200 Battery Withdrawn
J2464 Not reported 345 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.