Ledyard - Colby Line Tap substation interconnection queue

2 active projects totaling 330 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name Ledyard - Colby Line Tap as the point of interconnection, all in Worth County, IA.

2active projects
330active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1174 Not reported 345 165 Solar Active
J1175 Not reported 345 165 Wind Active
J1417 Not reported 345 75 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.