Replacing 130 MW of coal generation with BESS at Lansing; Lansing 4
n/r
130
Battery
Active
J1733
Not reported
161
50
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.