LAKEOVER EHV - MCADAMS EHV substation interconnection queue

3 active projects totaling 457 MW in the MISO queue.

3 MISO queue filings name LAKEOVER EHV - MCADAMS EHV as the point of interconnection, all in Madison County, MS.

3active projects
457active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3049 Not reported 500 188 Solar Active
J3053 Not reported 500 169 Solar Active
J3093 Not reported 500 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.