Lakefield Substation substation interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name Lakefield Substation as the point of interconnection, all in MN.

1active projects
100active MW
3total filed
Queue IDProjectkVMWResourceStatus
J051 Not reported 345 200 Wind Withdrawn
G386 Not reported 345 100 Wind Operational
J1098 Not reported 345 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.