Substation Scout

LAKE CHARLES BULK substation interconnection queue

1 active project totaling 165 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name LAKE CHARLES BULK as the point of interconnection, all in LA.

1active projects
165active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2700 Not reported 138 170 Solar Withdrawn
J1669 Not reported n/r 165 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first