Substation Scout

Lagrange Substation substation interconnection queue

2 active projects totaling 125 MW in the MISO queue.

2 MISO queue filings name Lagrange Substation as the point of interconnection, all in Lagrange County, IN.

2active projects
125active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1392 Not reported 138 100 Solar Active
J1323 Not reported 138 25 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first