Kokomo Webster St. - Walton substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Kokomo Webster St. - Walton as the point of interconnection, all in IN.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2038 Not reported 230 300 Wind Withdrawn
J3288 Not reported 230 125 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.