Substation Scout

Kokomo - Thorntown substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Kokomo - Thorntown as the point of interconnection, all in Clinton County, IN.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G447 Not reported 230 150 Wind Withdrawn
G571 Not reported 230 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first