Substation Scout

KEYSTONE - LUDINGTON substation interconnection queue

2 active projects totaling 597 MW in the MISO queue.

2 MISO queue filings name KEYSTONE - LUDINGTON as the point of interconnection, all in MI.

2active projects
597active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3723 Not reported 345 300 Solar Active
J3282 Not reported 345 297 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first