Substation Scout

KEO EHV Substation substation interconnection queue

2 active projects totaling 300 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name KEO EHV Substation as the point of interconnection, all in Lonoke County, AR.

2active projects
300active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1097 Not reported 500 500 Solar Withdrawn
J1415 Not reported 500 250 Solar Active
J1258 Not reported 500 50 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.