Kelso - Lutesville Line Tap substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Kelso - Lutesville Line Tap as the point of interconnection, all in Cape Girardeau County, MO.

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1059 Not reported 345 300 Solar Withdrawn
J1107 Not reported 345 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.