Substation Scout

JONESBORO (APL) - CASH substation interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name JONESBORO (APL) - CASH as the point of interconnection, all in Craighead County, AR.

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3627 Not reported 161 200 Solar Withdrawn
J2764 Not reported 161 150 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first