Substation Scout

Jewell - Spokane - St. Claire substation interconnection queue

2 active projects totaling 25.6 MW in the MISO queue.

2 MISO queue filings name Jewell - Spokane - St. Claire as the point of interconnection, all in Macomb County, MI.

2active projects
25.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
J025 Not reported 120 12.8 Other Operational
J242 Not reported 120 12.8 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first