Substation Scout

Jamestown substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Jamestown as the point of interconnection, all in ND.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2344 Not reported 345 200 Wind Withdrawn
J2518 Not reported 345 200 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first