Jackson North Substation substation interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Jackson North Substation as the point of interconnection, all in Jackson County, MN.

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
J977 Not reported 161 300 Wind Withdrawn
J2730 Not reported 161 150 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.