JACINTO substation interconnection queue

1 active project totaling 180 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name JACINTO as the point of interconnection, all in Liberty County, TX.

1active projects
180active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3605 Not reported n/r 465 Gas Withdrawn
J2689 Not reported 230 180 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.