Substation Scout

Ivanhoe Substation substation interconnection queue

1 active project totaling 17 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Ivanhoe Substation as the point of interconnection, all in St. Mary Parish, LA.

1active projects
17active MW
2total filed
Queue IDProjectkVMWResourceStatus
J323 Not reported n/r 19.8 Wind Withdrawn
J1247 Not reported 138 17 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first