Substation Scout

IOSCO - SPRUCE ROAD substation interconnection queue

2 active projects totaling 335 MW in the MISO queue.

2 MISO queue filings name IOSCO - SPRUCE ROAD as the point of interconnection, all in Alcona County, MI.

2active projects
335active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2611 Not reported 138 215 Solar Active
J3451 Not reported 138 120 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first