Huntley substation interconnection queue

2 active projects totaling 300 MW in the MISO queue, plus 2 with terminal status (shown grayed).

4 MISO queue filings name Huntley as the point of interconnection, all in Faribault County, MN.

2active projects
300active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2419 Not reported 345 300 Battery Withdrawn
J1503 Not reported n/r 150 Solar Active
J1504 Not reported n/r 150 Solar Active
J2420 Not reported 345 95 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.