Substation Scout

Hineston substation interconnection queue

2 active projects totaling 575 MW in the MISO queue.

2 MISO queue filings name Hineston as the point of interconnection, all in Rapides Parish, LA.

2active projects
575active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3209 Not reported n/r 350 Solar Active
J3479 Not reported n/r 225 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first