2 active projects totaling 340 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name Hill Valley as the point of interconnection, all in WI.

2active projects
340active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1781 Not reported 345 300 Wind Active
J1928 Not reported 345 100 Battery Withdrawn
J1931 Not reported 345 40 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.