0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name HERGETT - POWERLINE ROAD as the point of interconnection, all in Craighead County, AR.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J3621
Not reported
161
150
Solar
Withdrawn
J3622
Not reported
161
150
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.