Henderson to AB Brown substation interconnection queue
0 active projects
totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).
3 MISO queue filings name Henderson to AB Brown as the point of interconnection, all in Henderson County, KY.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
J2207
Not reported
138
300
Solar
Withdrawn
J2234
Not reported
138
300
Solar
Withdrawn
J1896
Not reported
138
100
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner