Hancock Substation substation interconnection queue

1 active project totaling 160 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
160active MW
2total filed
Queue IDProjectkVMWResourceStatus
J130 Not reported n/r 300 Gas Withdrawn
J2608 Not reported 115 160 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.