0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Hampton Corner Substation as the point of interconnection, all in MN.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
G883
Not reported
345
1,500
Wind
Withdrawn
J280
Not reported
345
221
Gas
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.