1 active project totaling 95 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Griffithville - Searcy Price Line Tap as the point of interconnection, all in White County, AR.

1active projects
95active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1134 Not reported 115 100 Solar Withdrawn
J1373 Not reported 115 95 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.