Substation Scout

Greenwood substation interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Greenwood as the point of interconnection, all in St. Clair County, MI.

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1526 Not reported 345 200 Solar Withdrawn
J2677 Not reported 120 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.