0 active projects
totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).
2 MISO queue filings name Greensboro-Gwynneville as the point of interconnection, all in Rush County, IN.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
J1593
Not reported
345
200
Solar
Withdrawn
J2421
Not reported
345
200
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.