GOODLAND - MORRISON DITCH substation interconnection queue

2 active projects totaling 200 MW in the MISO queue, plus 2 with terminal status (shown grayed).

4 MISO queue filings name GOODLAND - MORRISON DITCH as the point of interconnection, all in IN.

2active projects
200active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2226 Not reported 138 200 Solar Withdrawn
J3673 Not reported 138 150 Solar Withdrawn
J2048 Not reported 138 100 Wind Active
J2440 Not reported 138 100 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.