Substation Scout

Glenworth substation interconnection queue

2 active projects totaling 350 MW in the MISO queue.

2 MISO queue filings name Glenworth as the point of interconnection, all in Freeborn County, MN.

2active projects
350active MW
2total filed
Queue IDProjectkVMWResourceStatus
J407 Not reported 161 200 Wind Operational
J2728 Not reported n/r 150 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first