Substation Scout

GILMORE - WILSON substation interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3 MISO queue filings name GILMORE - WILSON as the point of interconnection, all in AR.

1active projects
150active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3575 Not reported 161 300 Solar Withdrawn
J2734 Not reported 161 150 Hybrid Active
J3706 Not reported 161 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first