Gibson - Francisco Line substation interconnection queue

1 active project totaling 280 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Gibson - Francisco Line as the point of interconnection, all in Gibson County, IN.

1active projects
280active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1295 Not reported 345 280 Solar Operational
J843 Not reported 345 200 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.